Jump to content


thesmadge

Moving distribution point from primary to secondary

Recommended Posts

looking for step - by step procedure for moving a site systems from primary site to new secondary site.

 

check many many forums and blogs. when checking these articles, i am left in a quandry.

 

We have a CAS and Primary. We need to expand our distribution points to more than 250 points, approx 320.

 

our thought here is to align sites with smaller bandwidths to the secondary site, which would mean to move the site system/.DP over to secondary site.

 

all DPs were BDPs under sccm 2007. SCCM 2012 aborbed all systems and assigned to the Primary. Do not want to cause issues when moving sites servers over to secondary. The boundary groups are being reassigned as DPs are moved over.

 

any lessons learned and best practice assitance would be great.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...


×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.