Jump to content


ranjb

Established Members
  • Content Count

    6
  • Joined

  • Last visited

Everything posted by ranjb

  1. Hi Everyone Currently have a new environment on 2002 CB with 1 site server and 1 DP. Just performed a source hierarchy migration from a 2002CB. It seems most app deployments are successful in the new hieracrchy however when deploying packages I run into an issue. It seems deploying just to the DP it fails but when deploying to both primary server and DP it succeeds. The site server also acts as a DP. When looking at the distrmgr log all is successful from that perspective but when reviewing the pkgxfermgr I see some errors. ExecStaticMethod failed (80041001) SMS_Distri
  2. Hi Sorry this is a duplicate post as I mistakenly posted in the CM2012 forum. I am currently doing a source hierarchy migration from 2002CB to 2002Cb in 1 forest trust with 2 domains. I done in a way so that the new site server mirrors the old one as much as possible. Apart from the server OS which is 2016 as opposed to 2012 in the old environment. What I am trying to achieve is a solution which isn’t going to cause too much downtime for the client as they have 3000 devices to service through MECM and want to do it with the least amount of downtime possible. I am at the po
  3. Really useful thread here as I am currently doing this with a client on CB2002 to CB2002. I do have some questions though which I am unsure about which I am hoping someone can validate for me. I am currently doing a source hierarchy migration from 2002CB to 2002Cb in 1 forest trust with 2 domains. I done in a way so that the new site server mirrors the old one as much as possible. Apart from the server OS which is 2016 as opposed to 2012 in the old environment. There are 4 DPs in the source and I can see they are all eligible for re-assignment however my question is if those servers sit
  4. Hi all I am in the process of performing a mecm migration using source hierarchy approach. The current environment is on current branch 2002 with 1 primary site and 4 DPs, no SUP. The plan is to create a new destination primary site but share the existing DPs as they don't have capability currently to move the DPs to new domain. Main objective is to get comanagement working as currently this isn't possible with server in old domain due to some legacy issues. Does anyone have any sources on how I could do this step by step? Many thanks
  5. Hi We currently deploy Windows 7 using an unattend.xml and the mechanism is using WDS on a 2008 r2 server. We have a number of different machines comprising of laptops and desktops, I am finding that all the correct drivers are not being picked up once the image has been loaded onto the client. An example is the graphics card is not working on 1 particular machine unless I manually install this using the CD after it has loaded win7. I am aware that using WDS I can integrate all of our drivers for all builds of machines (e.g. NIC card, graphics, sound drivers etc) and WDS will decide wh
  6. Hi Was wondering if someone can help. We have a bare bone customised image of WIndows 7 enterprise on a new WDS server we created. It runs on Server 2008 R2 so has the extra features of WDS such as driver injection but when we boot via PXE on a few laptops and choose the image, it begins the progress bar but then just says "windows is loading files" and just hangs there. It only seems to be with 2 specific laptops which have a CLEVO motherboard, other desktops and laptops seem to be fine. We have injected the proper network and chipset drivers into the boot image. There wasn't a
×
×
  • Create New...